Vanderbilt
Tower 1

THE PROBLEM

Not only were these dated areas not reflective of this affluent condominium, the elements of this building built in the 70s were in dire need of replacement.

1973

Building Constructed

Vanderbilt
Tower 1

THE SOLUTION

A complete demolition of the lobby, party room and the front entrance, replacing all of it with modern building materials. Saltwater intrusion had damaged the cables bringing power into the building so the complete power service to the building was upgraded.

THE PBS ADVANTAGE

We provided the client with proper budgets prior to having full construction drawings which this allowed the Board of Directors to move forward with the project architect because as they understood the costs involved and had a great team moving forward.

900

Walk from the Beach

"We have finished our renovation of our lobby at Vanderbilt Towers. This was the first time the building had been renovated since it was originally built in 1973. We trusted PBS Contractors to handle our condominium building with the utmost care and professionalism, and they didn’t let us down. Everyone on the PBS Team is very respectful. They treated the project with the residents in mind – always keeping them informed, as many of them have been here since 1973. We are happy to refer PBS to other Building Managers in the area."

Guillermo RuizBuilding Manager, Vanderbilt Towers